The work of connecting the pillars of the second floor is going on at a fast pace, the work of carving sculptures on the remaining 70 pillars of the first floor and ground floor has also been expedited.
The work of connecting the pillars of the second floor is going on at a fast pace, the work of carving sculptures on the remaining 70 pillars of the first floor and ground floor has also been expedited.