You are currently viewing Ram Mandir: Now Grand Carvings Will Be Visible Even At Night, There Will Be Special Lighting From Singhdwar To – Amar Ujala Hindi News Live

Ram Mandir: Now Grand Carvings Will Be Visible Even At Night, There Will Be Special Lighting From Singhdwar To – Amar Ujala Hindi News Live


Ram Mandir: Now grand carvings will be visible even at night, there will be special lighting from Singhdwar to

Now Ram Mandir will look grand even in light.
– Photo : Social Media

Expansion


The grand carvings of the Ram temple will be visible even at night. For this, different types of lighting will be arranged from Singhdwar to the front of the Ram temple. The facade lighting of the Ram temple will be of international standard. Regarding this, many companies also gave presentations in front of the engineers of TCS, the agency responsible for the construction of the temple, on Sunday.

Trending Videos

The meeting of the Ram Mandir Nirman Samiti began on Sunday. Before the meeting, Nripendra Mishra also inspected the ongoing work for the construction of the Ram Mandir. After the inspection, the construction work was reviewed in the meeting. Ram Mandir Trustee Dr Anil Mishra said that the lighting system of the Ram Mandir will be amazing. The lighting system of the main entrance gate of the Ram Mandir, Singh Dwar, and the facade of the temple, i.e. the front, will be of a different kind. Statues based on incidents from the Ram Katha, including gods and goddesses, have been engraved on the pillars of the Ram Mandir, grand carvings have been done. This carving should be visible even at night, hence brainstorming is being done regarding an amazing lighting system.

In this sequence, many light companies have given presentations on Sunday. By spreading different types of lights on the main gate, everyone has shown their specialty. Not only this, efforts will be made to reflect the story of Ram on the walls of Ram temple through light. There has also been a discussion on how the lighting system of the temple will be more grand than other days on the festival. However, no company has been selected yet. The company will be selected soon. Ram Mandir Nirman Samiti chairman Nripendra Mishra, general secretary Champat Rai, architect Ashish Sompura and engineers of implementing agencies were present in the meeting.

70% work of four temples of Parakota is complete

Dr Anil said that the construction of the rampart was reviewed in the meeting. Six temples are being built in the rampart, out of which 70 percent work of four temples has been completed. Whereas the construction work of two temples is only 20 percent complete. The work of laying white marble on the first floor is almost complete. Also, the construction work of the peak and Gudhi Mandap of Ram temple will be completed by December.

The idol of Lord Sheshavatar will be made by November

Ram Mandir Nirman Samiti Chairman Nripendra Mishra said that the construction of Sheshavtar temple is going on in the south-west of Ram Mandir. Sheshavtar is called Lakshman ji. Therefore, efforts are being made to make the height of Sheshavtar temple equal to the seat of Ramlala. It is also considered appropriate from the Vastu point of view. He said that the construction work of Sheshavtar’s idol has started. The idol will be made of marble and will reach Ayodhya by November. He said that the construction work is going on on the first floor in such a way that if a child reaches there, there will be no possibility of him falling. Railings are being installed for safety. He said that the deadline for all the works has been fixed as 31 December.



Source link