You are currently viewing An overbridge constructed six months ago at a cost of Rs 150 crore collapsed – Ayodhya News

An overbridge constructed six months ago at a cost of Rs 150 crore collapsed – Ayodhya News


Dialogue News Agency, Ayodhya

Updated Fri, 08 Aug 2025 10:57 PM IST

An overbridge constructed six months ago at a cost of Rs 150 crore collapsed



Ayodhya. The overbridge built at the Sahadatganj bypass Tirahe on the Ayodhya-Lucknow highway at a cost of Rs 150 crore collapsed. Due to this traffic had to be stopped. It was built six months ago. The overbridge sinking so soon raised its quality. Cracks are also clearly visible on its boundary. On Friday morning (NHAI) The local unit of the National Highways Authority of India came to know about the bridge collapse of the bridge. Officers and engineers immediately reached the spot and stopped traffic on the bridge. JE Yogendra Kumar of NHAI said that due to continuous rains, the part of the bridge is collapsed. The repair work has been started and the traffic on the bridge was changed. Told that traffic will be restored in two days.

loader

Trending videos



Source link